Upstream

JSC “PetroKazakhstan Kumkol Resources” (“PKKR”) – is an oil producing company registered in the Republic of Kazakhstan and engaged into development of oil fields and exploration blocks in the South Turgai basin: Kumkol (south-east part), South Kumkol, East Kumkol, North Nuraly, Aryskum, Kyzylkia, North-West Kyzylkia, Maybulak, South-West Karabulak.

For the purpose of fields and associated infrastructure development PKKR has carried out a number of major projects, including construction of collector systems to gather well production, infield motor roads, systems for water injection into reservoirs for the purpose of reservoir pressure maintenance, oil storage tanks, gas turbine units to provide own needs on power energy, as well as drilling and construction of wells. 

In 2007 “PKKR” constructed a 10 inch gas pipeline Kyzylkiya-Aryskum, put into operation an oil gathering system at Aryskum and Kyzylkiya fields, modified the reservoir pressure maintenance system at Kumkol field and also expanded the field camp at Aryskum field to provide accommodation to 200 additional people.In 2008 gas utilization facilities were commissioned at Kumkol, Aryskum, Kyzylkiya and Maibulak fields: the works related to the gas re-injection at Kumkol field, the gas transportation system from Kyzylkiya to Aryskum field and the gas injection system at Aryskum field were completed. All construction and installation works were also fully completed under the gas utilization project at Maibulak field. On five sites of the gas gathering system at Kumkol field the construction, installation and pre-commissioning operations were completed at the beginning of the 2nd quarter, 2009.   

Within the frameworks of the gas utilization program PKKR invested more than 143 mln USD into its implementation in years 2004-2010. The Company was among the pioneers that started to develop and implement the gas utilization program in Kazakhstan.

 

In 2010 together with JV JSC “Turgai Petroleum” the construction of the two additional gas turbine plants with the total capacity of 50 mW had started at Kumkol oilfield. For today this project was fully implemented, and the total capacity of the Kumkol field gas turbine power station was 100mW/. 

 

Investments made in the associated gas utilization project:

In 2010 together with JV JSC “Turgai Petroleum” the construction of the two additional gas turbine plants with the total capacity of 50 mW had started at Kumkol oilfield. For today this project was fully implemented, and the total capacity of the Kumkol field gas turbine power station was 100mW/. 

 

In the period of 2010-2017, a number of major projects were implemented, among them – upgrading of pipelines systems, power supply in the fields, introduction of the latest technology for oil and gas production, construction of a new office on the base of the Workover and expansion of medical clinic in Kumkol South field, expansion of the shift camps and construction of sports and bath complexes in Aryskum and Kumkol South fields. 

“PKKR” continues to be one of the major sponsors for social and charity projects in Kyzylorda Oblast. During its operation in the republic the company has allocated significant funds for the implementation of sponsorship and charity projects. The financial support provided by PKKR to schools, orphanages, summer camp Arai Sunrise, as well as to hospitals, clinics and other institutions, is widely known in Kazakhstan. 

Вы переходите на pkop.petrokazakhstan.kz